Post-construction cleaning checklist before handover
Ready for handover means
- No debris, cement or paint residue.
- Floors polished for their type.
- Clean, unscratched glass, frames and fixtures.
Order of work
- Remove large debris.
- Dust from top to bottom.
- Treat stains and residue.
- Clean glass and fixtures.
- Polish floors and walk through with the client.
How it differs from routine cleaning
It needs special equipment and materials and more time, and is priced by area and site condition.
Call or WhatsApp us on +966 53 509 1378, or request a quote.